The Cannelton Hydroelectric Project is located on the Kentucky side (left abutment) of the existing USACE Cannelton Locks and Dam facility on the Ohio River. The Project will divert water from the locks and dam through a powerhouse to generate an average annual output of approximately 390 GWh. Construction includes 950,000 cubic yards of underwater excavation and 450,000 cubic yards of earth excavation, 100,000 cubic yards of structural concrete, and 6,700 tons of reinforcing steel.