The project included a new 10-MGD treatment train with flow splitter, rapid mix, reactor clarifier, recarbonation and filtration, and clearwell transfer pumping. Plant improvements included new HSPS with 50-MGD capacity; a new dewatering facility with three belt filter presses, a gravity thickener and two blend tanks (500,000 gal); recirculation sludge pumps with Vortex mixing nozzles; progressive cavity sludge pumps; a dry polymer feed system; and a solids conveyor and radial stacker. A new lime softening facility includes two lime buildings with four 200-gph slakers, feed equipment and two 150-ton (65 VF) silos. A new Secondary Reservoir pump station was constructed including four new 12-MGD split-case horizontal pumps.