Located on a 242 acre greenfield site, this Wisconsin Data Center Campus includes three primary structures: a two-story conventional steel framed building with 294.4 MW critical IT load and associated administrative building, a three-story conventional steel framed building with 43.2 MW critical IT load, and a two story Central Utility Plant containing non-evaporative water-cooled chillers to support infrastructure spaces. Project includes early works and mass grading, OFCI management, and fulfilment of LEED construction prerequisite and credit requirements.