This project involves the introduction of two additional data centers to an existing campus. Both structures are Tilt-up, 48MW single-story buildings with 5 COLOs. The scope of work includes, but is not limited to, the development of the Data Center buildings, along with the associated civil, structural, architectural, mechanical, electrical, telecommunications, security, and miscellaneous elements. The site requires additional logistical coordination to safely and successfully interface with areas of the campus that are operational, as well as portions of the site that are in a preceding phase of construction.