Bridges

I-84 Mixmaster Bridge Rehabilitation

I-84 Mixmaster Bridge Rehabilitation

Location
Waterbury, Connecticut
Owner
State of Connecticut Department of Transportation
Architect
HNTB Corporation
Contract Value
$161,500,000

This project consists of the rehabilitation of ten bridges located along I-84 and Route 8. Bridge parapets and curbing modifications will be restored, deck spalls will be repaired, decks and overlays will be replaced, bridge drainage will be improved, and new asphalt will be paved. Structurally, steel, concrete, and rebar will be repaired. To alleviate traffic, a temporary bypass road consisting of three temporary bridge structures and 2,500 linear feet of on-grade roadway will be constructed and removed at the completion of the project.

Walsh

WALSH CONSTRUCTION

929 West Adams Street
Chicago, Illinois 60607
T: 312.563.5400
F: 312.563.5466

Walsh

ARCHER WESTERN

2839 Paces Ferry Road SE
Suite 1200
Atlanta, Georgia 30339
T: 404.495.8700
F: 404.495.8701

Walsh

WALSH CANADA

36 York Mills Road
Suite 302
Toronto, Ontario M2P 2E9
T: 416.849.9000
F: 416.849.9100

©2021 The Walsh Group. An Equal Opportunity Employer, Disability/Veteran. All Rights Reserved.   Walsh Canada Accessibility