Northwest Corridor Managed Lanes P3

Northwest Corridor Managed Lanes P3

Location
Marietta, Georgia
Owner
Georgia Department of Transportation
Architect
Parsons Transportation Group
Contract Value
$840,000,000

The project is the largest transportation infrastructure project in the history of the Georgia Department of Transportation (GDOT). The design-build-finance project will complete 29.7 miles of reversible managed toll lanes along I-75 and I-575 in Cobb and Cherokee Counties. The proposed improvements extend existing high-occupancy vehicle lanes northward along I-75 and I-575. The project will include 1 million cubic yards of unclassified excavation, 140,000 linear feet of drainage, 315,000 square yards of concrete paving, 280,000 linear feet of concrete barrier, 1.4 million square feet of sound wall, 1 million square feet of bridge deck (39 bridges) and 900,000 square feet of retaining wall.

The project is the largest transportation infrastructure project in the history of the Georgia Department of Transportation.

Additional Experience

Bridges

Bridges

Aviation

Aviation

Transit

Transit

Walsh

WALSH CONSTRUCTION

929 West Adams Street
Chicago, Illinois 60607
T: 312.563.5400
F: 312.563.5466

Walsh

ARCHER WESTERN

2839 Paces Ferry Road SE
Suite 1200
Atlanta, Georgia 30339
T: 404.495.8700
F: 404.495.8701

Walsh

WALSH CANADA

36 York Mills Road
Suite 302
Toronto, Ontario M2P 2E9
T: 416.849.9000
F: 416.849.9100

©2021 The Walsh Group. An Equal Opportunity Employer, Disability/Veteran. All Rights Reserved.   Walsh Canada Accessibility